Satish Kumar Singh      Thu, 28/09/2023

This heavylift transportation involved moving a 41-metre-long / 680MT Ammonia Converter and a 30-metre-long / 380MT Ammonia Unitized Chiller from the supplier's factory to the load port by Multi-modal Transportation.
 
Road transportation from the supplier's factory to the nearest jetty, rolling-on the two lengthy columns onto the barge, coastal movement to the final load port on the west coast of India and feeding alongside the vessel were all part of our scope.
 
Major features involved in the challenging move were:
- Felicitous vehicle configuration
- Transporting with civil work enroute
- Rolling-on and securing the cargo on the barge meeting the short tide window
- Double banking operation at Mumbai port.
 
Both these units were safely delivered at the Indian loading port by Total Movements for further shipping to its destination. All the cargo was delivered in a safe and timely manner, much to the delight of our customer.
 
We'd like to express our gratitude to all the stakeholders who supported us in making this shipment a huge success.

Moving Cargo with Passion!
https://totalmove.in/

Photo gallery

Share!