Satish Kumar Singh      Fri, 01/03/2024
This Port to Door Movement was safely executed considering the critical cargo dimensions (having a diameter of about 18m) from India upto the project site in UAE.

Loading the ODCs (weighing 615 MT & 361MT) & its accessories onto the vessel at the load port in India, shipping from India to UAE, unloading & discharging the ODCs onto the barge, barging to the jetty near the project site, rolling off & transporting to the project site was all our scope of work.

The major highlights of this project involved:

1. Owing to the cargo's critical dimensions, a thorough inspection & technical study was done to plan the entire transportation scheme.
2. Sourcing a suitable vessel capable of loading such large pieces within the tight laycan.
3. Arrangement of suitable approved Barges and Tugs at UAE for safe receipt of the Cargo.
4. Co-ordination with multiple authorities in UAE to accomplish the operation.
5. Execution of Contingency plans to mitigate cyclonic weather conditions.
 
24/7 coordination, multiple technical iterations, advance/meticulous planning, plus our engineering team's expertise ensured the safe and timely delivery of the cargo to the project site.

A heartfelt gratitude to all the stakeholders involved who supported us in making this a seamless execution.

Moving Cargo with Passion!
https://totalmove.in/
Photo gallery

Share!