Willie Tseng      Tue, 26/11/2024

THLG member EZ Link Taiwan handled 2 sets of transformers via heavy lift vessel from Taichung port in Taiwan to Portland in OR, USA, with dimensions / weight 8.55 x 4.55 x 4.7 m / 1,360 kgs.

EZ Link project team committed to handling loading of cargo from shipside onto vessel in a seamless operation, monitoring all loading procedures at shipside, including:

  • Longshoremen.
  • Careful utilization of forklift to lift-up steel wire sling onto hook/spreader beam/lifting beam respectively, with use of EWP (Elevated Work Platform).
  • Coordination of SPMT truck drivers from warehouse to shipside.
  • Stevedores paying high attention of cargo loading from shipside onto vessel board.
  • Vessel operator monitoring all steps of lashing/dunnage/wedge/bracing and blocking in vessel hatch.

EZ Link professional team carefully monitored the operation at all stages.

The clients in Taiwan / USA were satisfied with EZ Link’s “Timely and Reliable service” as always.

Photo gallery

Share!